Friday 8 June 2012

How A Crane Works ( Amazing )

The crane arrives across the field with four trailers 

The GTK1100's first job was in Ilshofen, Baden Wrtemberg, southern Germanywhere it was used to install a 2KW wind turbine in a field for Repower Systems. The crane is designed to travel on four or five trailers depending on its configuration and local road regulations. The Ilshofen job did not require additional counterweight so its was delivered on four trailers.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No comments:

Post a Comment